APPLICATION OF EARNED VALUE ANALYSIS FOR COST MONITORING IN CONSTRUCTION PROJECTS

Devdas Kisan Tamboli

Knowledge Axis, R4/003, Panvelkar Regency, Near Fr. Agnel School, Kohojgaon, Ambarnath (w) 421501, India

27-40

Vol: 4, Issue: 1, 2014

Receiving Date: Acceptance Date:

Publication Date:

Download PDF

Abstract

In construction or any other projects periodical monitoring and identification of key indicators is necessary. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators is an important function of project management. Therefore, during the construction phase, it is the prime responsibility of project managers to monitor cost and avoid any overruns to maintain the cost baseline. Cost monitoring is an ongoing process and its importance cannot be undermined during the project life cycle. It can be monitored by using traditional approach of direct reporting of actual cost against budget. However, the comparison of budget versus actual spending does not indicate the worth of the work which is completed at any given time. This approach does not portray the true cost performance of the project. Because of these limitations, this paper discusses the applications of Earned Value Analysis (EVA) for cost management of construction projects. Besides traditional approach, EVA is a three-dimensional technique that compares the budgeted value of work scheduled with the earned value of physical work completed and the actual cost of work completed. Therefore, cost management by EVA is an objective measure of actual work performed. This paper uses a case study, an example application of EVA as a cost monitoring tool. This case study reaffirms the benefits of using EVA for project cash flow analysis and forecasting

Keywords: construction; projects; monitoring; indicators

References

  1. CHRISTENSEN, D. S. (1998) The Cost and Benefits of the Earned value Management Process. Acquisition Review Quarterly.
  2. FLEMING, Q. W. & KOPPELMAN, J. M. (1999). Earned value Project Management, 2nd Ed.Newton Square: Project Management Institute.
  3. H. Neale, and D. Neale, “Construction Planning,” London: Thomas Telford, 1989. pp. 160.
  4. P. A. Kern, and T. C. Formoso, “Guidelines for improving cost management in fast, complex and uncertain construction projects,” Proc. of 12th Annual Conference on Lean Construction,Denmark, Aug 2004.
  5. R. Kenley, “Managing through Earned Value,” in Financing Construction, London and NewYork: Spon Press, 2003, pp.105 – 135.
  6. H. N. Ahuja, S. P. Dozzi, and S. M. Abourizk, “Plan Implementation, Monitoring, and Control”in Project Management Techniques in Planning and Controlling Construction Projects, vol. II, New York: Wiley, 1994, pp. 274 – 277.
  7. O. Kwon, S. Kim, J. Paek, and S. Eom, “Application of Earned Value in Korean Construction Industry – A Case Study,” Journal of Asian Architecture and Building Engineering, vol. 7, May2008, pp. 69 – 76.
Back

Disclaimer: Indexing of published papers is subject to the evaluation and acceptance criteria of the respective indexing agencies. While we strive to maintain high academic and editorial standards, International Journal of Research in Science and Technology does not guarantee the indexing of any published paper. Acceptance and inclusion in indexing databases are determined by the quality, originality, and relevance of the paper, and are at the sole discretion of the indexing bodies.